is created to avoid unnecessary failures (Alarms),
to Calibrate / Validate Systems and to instruct crew onboard.
During our Annual Inspection Systems are Checked,
Calibrated ( if posible ), tested and if necessary adjusted and/or repaired according maker’s instructions.
After each Inspection the crew is instructed on how to perform all tests and how to maintain a good working System
All equipment in Pump Room ( Deck ), Engine Room ( Foam Room ), CCR are inspected and checked for correct installation and good working according maker’s instructions.
Most Failures / problems onboard are caused when Systems are not used on a regular base.
Therefor after each Inspection the crew will be instructed on how to perform all tests and how to maintain a good working System. Instructions are left onboard to make testing easier.
At the end of every Annual Inspection we will issue a Certificate.
This Certificate confirms that System is in good working condition